?>
Our work

Projects that serve communities

Portfolio

More projects

Two decades of public buildings, infrastructure, agriculture and commercial work for governments, funders and private clients across the Caribbean.

The Balata: A Contemporary Container Home
House Plans2026

The Balata: A Contemporary Container Home

A 2026 design from Sorell’s range of ready-made house plans: shipping containers stacked into a two-storey contemporary home on concrete columns, an affordable route to a modern home on Dominica’s sloping lots.

Container home
Commercial Building Concept Design
Commercial2024

Commercial Building Concept Design

Architectural concept and structural design for a multi-storey commercial building in Roseau, with a timber-screened street façade, balconies and rooftop solar.

Roseau, Dominica
Hillside Residence Renovation
Residential2025

Hillside Residence Renovation

Structural appraisal of a two-storey hillside home ahead of its renovation (architectural concept and render by ARTS).

Goodwill, Dominica
Coastal Home Feasibility Study, Bioche
Feasibility2026

Coastal Home Feasibility Study, Bioche

Site inspection, geology and soils review, risk assessment, foundation options and budget for a new home on a steep 3-acre coastal site. Our finding: the home is feasible with the right engineering.

Bioche, St Peter, Dominica
St Patrick’s Church Rehabilitation
Heritage & Community2019

St Patrick’s Church Rehabilitation

Architectural and structural rehabilitation concept for a 1920s stone church badly damaged by Hurricane Maria, for the Catholic Diocese of Roseau.

Grand Bay, Dominica
Roseau Cathedral Rehabilitation
Heritage2022–2025

Roseau Cathedral Rehabilitation

Sorell led the repairs to Roseau’s cathedral after Hurricane Maria. We reviewed and refined the designs, managed the rebuilding of the tower with a new steeple roof and cross, and oversaw the making and fitting of new window shutters. Because the church relies on donations, we also priced every remaining package of work in Bills of Quantities, so the parish can raise funds and plan each stage with confidence.

Roseau, Dominica
H.H.V. Whitchurch Big W Supermarket
Commercial2023

H.H.V. Whitchurch Big W Supermarket

A new mega supermarket for H.H.V. Whitchurch, one of Dominica’s oldest family retailers, with more than a century of trading behind it. Sorell designed the building and supervised its construction: a steel frame that gives the store a large, open sales floor, with the company’s offices on a mezzanine level. Steel framing is quick to erect and leaves the floor plan flexible as the business grows.

Canefield, Dominica
Do It Center Hardware Store
Commercial2018

Do It Center Hardware Store

Do It Center brought the Do It Best hardware and building-materials brand to Dominica in 2018, as the island rebuilt after Hurricane Maria. Sorell was project manager for the construction of its main hardware store on Goodwill Road, a two-storey, steel-framed building. We coordinated the works from frame erection through to the finished building.

Goodwill, Dominica
Grand Fond Water Supply & Distribution, Phase I
Water Supply2013

Grand Fond Water Supply & Distribution, Phase I

Phase I of a new water supply and distribution system for the Grand Fond community: a concrete river intake with an overflow weir, a steel storage tank above the village, and a transmission pipeline laid along steep hillside tracks, with exposed sections carried on supports along retaining walls. Sorell reviewed the design and managed the supervision of construction, giving Grand Fond a reliable water supply built to cope with Dominica’s rugged terrain and heavy rains.

Grand Fond, Dominica
Pierre Charles Secondary School TVET Workshop
Education

Pierre Charles Secondary School TVET Workshop

A new auto-mechanics workshop at Pierre Charles Secondary School in Grand Bay, built for technical and vocational education and training. Sorell designed the workshop and managed the supervision of its construction. The double-height building has open service bays where students work on vehicles, a classroom, and durable, easy-to-clean finishes such as a sealed epoxy floor, giving the school a modern space to train the island’s next generation of mechanics.

Grand Bay, Dominica
Environmental Impact Assessments
Environment2014–2021

Environmental Impact Assessments

Sorell carries out environmental impact assessments (EIAs) for public and private developments, helping clients meet planning and funding requirements and build responsibly. Each assessment covers:

  • Desktop study: reviewing maps, records, previous studies and planning requirements for the site and its surroundings.
  • Site reconnaissance: walking the site to confirm conditions on the ground and identify key environmental and social issues.
  • Baseline studies: recording the existing environmental and social conditions on and around the site.
  • Assessment of project designs: identifying potential impacts and recommending design changes to avoid or reduce them.
  • Community consultations: engaging residents and stakeholders, and reflecting their concerns in the project.
  • Environmental Management Plans (EMPs): practical measures to mitigate impacts during construction and operation.

Assessments include:

  • 2014 · Kempinski resort development, Portsmouth
  • 2015 · Silver Beach Resort, Picard, Portsmouth: a 150–200-room, five-star beach resort on a 12-acre site overlooking Prince Rupert Bay
  • 2017 · UWI Open Campus upgrades, environmental specialist considerations
  • 2021 · Oriental Developers (Caribbean) Ltd, Goodwill Road: a five-storey, four-star hotel and commercial complex on the 2.3-acre former Public Works Corporation garage site
Dominica
Architecture

Remodeling of National Bank of Dominica Branches

The redesign of the customer floors at all four National Bank of Dominica branches, Hillsborough Street, Independence Street, Canefield and Portsmouth, in a programme of about EC$4 million. Working around new teller desks by Canadian firm EVANS, our designers gave every branch a unified look: a brand wall in the bank’s brightest colours, curved ceilings and floor finishes that define spaces without partitions, and digital displays and touch-screen kiosks that showcase the bank’s services. Designed in 2010 by Millenia, now part of Sorell.

Banking
Carib Territory Water Supply Project
Water Supply2006–2008

Carib Territory Water Supply

Phase 1 of a new water supply for the Kalinago Territory, funded by the EU under STABEX. Appointed by DOWASCO in 2006, Sorell supervised the construction of 14,260 ft of new distribution main from the Gaulette River storage tank to Bataka, a new 40,000-gallon storage tank with chlorination at Bataka, pressure-reducing and check valves, and hydraulic and structural improvements to the existing supply line. Our role covered supervision, inspection and monitoring, design amendments, claims certification, site meetings and progress reporting.

Carib Territory, Dominica
Civil

Roseau River Promenade

For the Ministry of Tourism, Sorell designed and supervised the redevelopment of the south-west bank of the Roseau River, making the riverside safer from flooding and more inviting for visitors, residents and businesses. The scheme pairs a 1,000 ft river-defence wall with a riverside boardwalk between the Roseau west bridge and the Dominica–China Friendship Bridge, shaded green spaces, a food court of vending kiosks, a playground, washrooms and water features, with step-free access throughout. We also led the architectural design, using 3D models to test and refine the concept.

Roseau, Dominica
Education2011

Hospitality & Maritime Training Institute

Design of the EU-funded Hospitality and Maritime Training Institute in St Vincent, a five-block campus of teaching, administration and training-hotel, dormitory, maritime workshop and training-pool buildings. Sorell led a joint venture of three firms, acting as team leader and carrying out the structural and civil engineering design, while our partner firms provided the architecture and mechanical, electrical and plumbing design. Over 14 months the team delivered preliminary and detailed designs, technical specifications, priced Bills of Quantities, tender drawings, the tender evaluation report and contract documents.

St Vincent and the Grenadines
Healthcare

PACIS Respite Center

A respite centre in Chance, Portsmouth, for PACIS, the parents’ association advocating for the inclusion of children with disabilities. Portsmouth has the island’s highest concentration of children with developmental delays and disabilities. Our design and project management team worked closely with PACIS to set the brief: low running costs and full use of the sloping site. On the ground floor a 102 m² main hall is lined with classrooms, a staff room, a doctor’s office and an exercise room; the lower floor holds a multi-sensory room, dormitory, kitchen and laundry. A covered ramp links both levels for wheelchair users, and a varied palette of finishes adds sensory interest.

Portsmouth, Dominica
basic needs projects dominica
Community

Basic Needs Trust Fund Projects

With funding from the Caribbean Development Bank and the Government of Dominica, through the Ministry of Social Services, Community Development and Gender Affairs, Sorell has delivered a wide range of Basic Needs Trust Fund projects, from design through to construction supervision. Across the BNTF 5 to 9 programmes our work has spanned education, water and sanitation, access roads and health, bringing lasting improvements to rural communities.

Island-wide, Dominica
Eco-Tourism Development Programme
Tourism2005–2007

Eco-Tourism Development Programme

Under this EU-funded programme with the Ministry of Tourism, Sorell provided architectural and engineering design, tender management, supervision and project management for more than 20 sub-projects across Dominica, each delivered to strict timeframes and budgets. The programme developed many of the island’s prime tourist sites and made community-based tourism a key part of Dominica’s eco-tourism offer. On the follow-up Tourism Sector Development Programme, from 2007, our CEO served as Technical Expert, with sites including the Indian River Tourism Facility, the Wotten Waven Interpretation Centre and the Bellevue Chopin Resource Centre. Our work on both programmes earned Sorell a Ministry of Tourism award in 2010.

Island-wide, Dominica
Multi-purpose Packinghouses
Agriculture2009

Multi-purpose Packinghouses

Design and supervision of two certified multi-purpose packinghouses for the Ministry of Agriculture, bringing in new technology to improve the quality, safety and integrity of Dominica’s agricultural produce. In Roseau we retrofitted an existing building; in Portsmouth we designed a completely new structure. Our work ran from detailed designs and cost estimates to the layout of the processing equipment and supervision of the works.

Roseau & Portsmouth, Dominica
Inland Reception & Distribution Centres
Agriculture2009

Inland Reception & Distribution Centres

Three EU-funded Inland Reception and Distribution Centres at Marigot, Portsmouth and Fond Cole for the Banana Industry Trust, built to get farmers’ produce to market more efficiently. Sorell prepared the preliminary designs, costings, detailed technical designs and tender documents, then supervised the works contract through to completion.

Marigot, Portsmouth & Fond Cole
castle bruce project
Agriculture2005–2008

Castle Bruce Drainage & Irrigation

Appointed by the Banana Industry Trust in 2005 as supervising consultant for this EU-funded scheme serving about 360 acres of farmland in Castle Bruce. The irrigation works included an over-weir intake on the Fond Figues River, about 2.6 km of PVC and ductile-iron pipeline with river and ravine crossings, air valves, filter stations and farm-gate head stations. The drainage works cleared and re-cut existing drains, excavated new ones, protected the riverbanks and added culvert crossings. Sorell provided supervision, design amendments, claims certification and progress reporting.

Castle Bruce, Dominica
Roseau Improvement Maintenance Project
Roads2008–2011

Roseau Improvement Maintenance Project

For the Ministry of Public Works, with CDB funding, Sorell served as Assistant Resident Engineer to DESSAU on the reconstruction of 11.3 km of Roseau Valley roads, from Bath Estate to Laudat, including Trafalgar and the spur road to St Aroment. The works covered new asphalt surfacing, box drains, culverts and ditches, reinforced concrete and gabion retaining walls, guard rails, road markings and signage. Our team verified the contractor’s surveys, ran quality control, tracked progress and cost with earned-value control, reviewed claims and change orders, responded to public concerns and supervised the as-built drawings.

Roseau Valley, Dominica
Tourism2007–2010

Tourism Development Project

For St Vincent and the Grenadines’ Ministry of Tourism, with EU funding, Sorell was appointed in July 2007 to deliver upgrades at twenty visitor sites over a works programme of about 29 months, from Baleine Falls, Dark View Falls and Wallilabou Falls Park to the Botanical Gardens, Belmont Lookout, Fort Murray on Union Island and the Tobago Cays Marine Park. Working from site designs by Ivor Jackson & Associates, we reviewed and developed the designs, prepared Bills of Quantities, specifications and tender dossiers, administered the works contracts and trained the Ministry’s counterpart staff.

St Vincent and the Grenadines
Port Revitalisation Project
Maritime2010–2011

Port Rationalisation & Development Study

A Caribbean Development Bank-funded master plan for the St Vincent and the Grenadines Port Authority, prepared with UK engineers Mott MacDonald. The study reviewed Kingstown Port, the Campden Park container port and the ports at Chateaubelair, Wallilabou, Bequia, Canouan and Union Island, and set out forecasts, costed development options and a recommended master plan. Sorell led the in-country work: stakeholder meetings, traffic and business surveys around Kingstown Port, and the field observations and social surveys behind the environmental and socio-economic baseline, with our CEO, Alistair Grell, as the study’s infrastructure engineer.

St Vincent and the Grenadines
Commercial

AID Bank Retrofit

A renovation of the AID Bank’s early-1990s office building, to fix wear and defects, improve comfort for staff and customers, and refresh the bank’s image. Our design team developed architectural and structural solutions to suit the bank’s taste and budget: low-maintenance rain-screen cladding and high-efficiency low-e windows to improve energy performance, a redesigned main entrance, open-plan work areas with glazed partitions to share daylight, reflective acoustic ceilings, and a larger boardroom that converts into a conference room with new ICT.

Roseau, Dominica
Zenga and Teviot River Defense
River Defence2013–2015

Zenga & Teviot River Defences

Along the Zenga and Teviot rivers in Mesopotamia, eroding riverbanks and subsiding land were putting the road, homes and farmland at risk. On this World Bank-funded project for the Ministry of Works, gabion basket walls now retain the banks and protect the land behind them. Sorell reviewed the design and supervised construction through to completion.

Mesopotamia, St Vincent

Looking for a home design? See our pre-designed house plans →

“Though challenges have arisen, the consultant has shown a willingness to work collaboratively addressing matters of concern.” — Basic Needs Trust Fund (BNTF)

Have a project like these?

Get a Quote →
WhatsApp us